Muosa Neamah, N., & Bayda A. Kalaf. (2024). Solving tri-criteria: total completion time, total late work, and maximum earliness by using exact, and heuristic methods on single machine scheduling problem. Iraqi Journal For Computer Science and Mathematics, 5(3), 14–25. https://doi.org/10.52866/ijcsm.2024.05.03.002